Description:
When the old “Home Office” was developed the Admiral Scaffolding Group convinced the client that cost savings could be made by incorporating a “rolling” Haki system temporary roof. By constructing the temporary structure on castors and a beam section the expensive roof was able to be rolled into different positions rather than incurring the extra cost of re-erecting it.