Chelsea Hospital
July 21, 2009
| Contract | Chelsea Hospital |
| Client | Westminster Health Authority |
| Main Contractor | Cosmur Construction Limited |
Description:
A similar construction as the project at Chelsea FC was the reason that lead cosmur to re-engage the Group’s services. Again another floor was to be erected to an existing wing of the hospital and the Group deployed exactly the same method of towers and beamed bridging to give the client what they wanted.