University of Westminster
July 8, 2009 by admin
Filed under Projects, Refurbishment
| Contract | University of Westminster |
| Client | University of Westminster |
| Main Contractor | Cosmur Construction (London) Ltd |
Description:
This project entailed hoisting around 40 tonnes of scaffolding plant over a busy Regent St up onto the university roof. This meant that combined with a very stringent programme the health and safety requirements were extremely high. Good liaison with the client enabled a strike and shift programme to be drawn up which allowed for the works to be completed within the allotted timescale. This plant then had to be lowered down the rear of the building to allow a scaffold that had been specifically designed to keep loadings off of the low level roofs to be built. There were some very historic roof lights that had to be protected at all costs – thankfully our considerate operatives performed admirably allowing a potentially troublesome project being completed successfully and on time for all parties.
Jewish Care Home
| Contract | Jewish Care Home |
| Client | Jewish Care Home |
| Main Contractor | Bowmer & Kirkland Ltd |
Description:
Erecting a standard scaffold with progress of works for a concrete frame and then adapting it to suit all of the following trades was the task that confronted the Group. In discussion with the client all needs were addressed and a correct specification for the project developed. This process enabled the project to be costed effectively to the mutual benefit of both the client and the Group.
Vale Road
| Contract | Vale Road, Windsor |
| Client | Lifestyle Care |
| Main Contractor | Healthcare Development Services Ltd |
Description:
Providing accommodation for the elderly is the specialisation of our client with the projects all typical of this brick built four storey block.
Battersea Park Road
| Contract | Battersea Park Road |
| Client | Battersea Park Investments |
| Main Contractor | MP Brothers Ltd |
Description:
This project comprised the re-furbishment of existing warehouses and the construction of a typical concrete framed building. The ground floor contains retail units and a day nursery whilst on the upper four floors sumptuous views across London are accessed from luxurious apartments.
Heart Centre Walton
| Contract | Heart Centre Walton |
| Client | Walton Heart Centre |
| Main Contractor | RI Building Services |
Description:
This project entailed the complete construction of the state of the art combination of retail and residence. Shopping does not get much better than this modern mall and on the higher levels offices combine with luxurious apartments ranging from one bed to penthouse; a complete urban marriage.
Swan Car Park
July 7, 2009 by admin
Filed under Projects, System Scaffold
| Contract | Swan Car Park, Leatherhead |
| Client | Travelodge plc |
| Main Contractor | Anglo Holt Ltd |
Description:
The Admiral Scaffolding Group thought the best value for the client on this timber framed construction was to use the Haki Scaffolding System. This allows a much faster erection, which is essential in timber frame construction, and greater flexibility and hence speed in the adaptation of the scaffold for the brickwork contractor.


Graham St
July 7, 2009 by admin
Filed under Projects, Residential
| Contract | Graham St, London N1 |
| Client | Goldcrest Homes Ltd |
| Main Contractor | Ellmer Construction Ltd |
Description:
This contract comprised the construction of 45 private flats and 10 housing association flats in the heart of London.

Augustus Road
July 7, 2009 by admin
Filed under Projects, Residential
| Contract | Augustus Road, SW19 |
| Client | Trustees of the Institute of Religious of Mary Immaculate |
| Main Contractor | Botes Construction Ltd |
Description:
This construction comprised the erection of a steel frame followed by timber panelling with a final outer skin of brickwork. To achieve this a traditional scaffold was erected at floor levels in advance of the steel frame. The scaffold was subsequently adapted for brickwork and panelling.

Livingstone House
July 7, 2009 by admin
Filed under Haki Temporary Roofing, Projects, Refurbishment
| Contract | Livingstone House, Wyndham Rd SE5 |
| Client | London Borough Of Southwark |
| Main Contractor | Albert Soden Ltd |
Description:
This contract involved the complete re-roofing of all sections of Livingstone House whilst at the same time allowing a full external refurbishment of the block. To ensure that the tenants could remain in residence the Client decided to provide a full scaffold that would incorporate a temporary roof. In discussions with the Main Contractor, Admiral suggested the use of a lightweight Haki temporary roof system. (For more details of this type of scaffold please refer to our specialist page.)
The roof proved challenging because it had to cover four sections of Livingstone House, each of which abutted at right angles a roof of a different height. Admiral designed a scheme which allowed for spine beams to bridge the lower roofs allowing the abutment to be made watertight.


Johnson and Kilmuir Houses
July 7, 2009 by admin
Filed under Projects, Refurbishment
| Contract | Johnson and Kilmuir Houses |
| Client | Metropolitan Police |
| Main Contractor | Botes Building Ltd |
Description:
A complete external refurbishment was required including the provision of platform hoists.