Chelsea Hospital

July 21, 2009 by admin  
Filed under New Build, Projects

Contract Chelsea Hospital
Client Cosmur Construction Ltd
Main Contractor Westminster Health Authority

Description:

A similar construction as the project at Chelsea FC was the reason that lead cosmur to re-engage the Group’s services. Again another floor was to be erected to an existing wing of the hospital and the Group deployed exactly the same method of towers and beamed bridging to give the client what they wanted.


Jewish Care Home

July 8, 2009 by admin  
Filed under New Build, Projects

Contract Jewish Care Home
Client Jewish Care Home
Main Contractor Bowmer & Kirkland Ltd

Description:

Erecting a standard scaffold with progress of works for a concrete frame and then adapting it to suit all of the following trades was the task that confronted the Group. In discussion with the client all needs were addressed and a correct specification for the project developed. This process enabled the project to be costed effectively to the mutual benefit of both the client and the Group.

Vale Rd

July 8, 2009 by admin  
Filed under New Build, Projects

Contract Vale Rd, Windsor
Client Healthcare Development Services Ltd
Main Contractor

Description:

Providing accommodation for the elderly is the specialisation of our client with the projects all typical of this brick built four storey block.

Battersea Park Rd

July 8, 2009 by admin  
Filed under New Build, Projects

Contract Battersea Park Rd
Client MP Brothers Ltd
Main Contractor

Description:

This project comprised the re-furbishment of existing warehouses and the construction of a typical concrete framed building. The ground floor contains retail units and a day nursery whilst on the upper four floors sumptuous views across London are accessed from luxurious apartments.

Heart Centre Walton

July 8, 2009 by admin  
Filed under New Build, Projects

Contract Heart Centre Walton
Client RI Building Services Ltd
Main Contractor

Description:

This project entailed the complete construction of the state of the art combination of retail and residence. Shopping does not get much better than this modern mall and on the higher levels offices combine with luxurious apartments ranging from one bed to penthouse; a complete urban marriage.

Upper Tulse Hill

July 8, 2009 by admin  
Filed under New Build, Projects

Contract Upper Tulse Hill
Client
Main Contractor Greenacre Homes Ltd

Description:

Homerton Hospital, Hackney

July 7, 2009 by admin  
Filed under New Build, Projects

Contract Homerton Hospital, Hackney
Client Homerton University Hospital NHS Trust
Main Contractor Killby & Gayford Ltd

Description:

This contract involved the construction of a new operating wing within a site area that was surrounded by existing buildings, all of which would be fully operational throughout the duration of the works. With security at a premium, all site personnel had to enter the site via a temporary access point. With such a high volume of passengers Admiral proposed the use of the Haki staircase tower. (For more details of this type of scaffold please refer to our specialist page.)

This would be erected in the main compound and would have a walkway platform spanning the adjacent roof. Once into the site area the scaffold erection involved the use of a Haki temporary roof to ensure that the site suffered no water ingress.