<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Admiral Scaffolding &#187; Haki Temporary Roofing</title>
	<atom:link href="http://admiral-scaffolding.co.uk/category/projects/haki-temporary-roofing/feed/" rel="self" type="application/rss+xml" />
	<link>http://admiral-scaffolding.co.uk</link>
	<description>The london scaffolding company</description>
	<lastBuildDate>Tue, 26 Jul 2011 17:12:36 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>Chelsea Football Club</title>
		<link>http://admiral-scaffolding.co.uk/chelsea-football-club/</link>
		<comments>http://admiral-scaffolding.co.uk/chelsea-football-club/#comments</comments>
		<pubDate>Tue, 21 Jul 2009 07:03:33 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Haki Temporary Roofing]]></category>

		<guid isPermaLink="false">http://admiral-scaffolding.co.uk/?p=522</guid>
		<description><![CDATA[Contract Chelsea Football Club Client Chelsea Football Club Main Contractor Cosmur Construction Ltd Description: This was a project that had to be completed within the very short footballing &#8220;close season&#8221;. It took 6 teams of scaffolders to erect independent towers around the existing West Stand to enable a beamed structure to be linked to produce [...]]]></description>
			<content:encoded><![CDATA[<table border="0" cellspacing="0" cellpadding="0" width="629">
<tbody>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Contract</span></strong></td>
<td width="407" valign="bottom">Chelsea Football Club</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Client</span></strong></td>
<td width="407" valign="bottom">Chelsea Football Club</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Main Contractor</span></strong></td>
<td width="407" valign="bottom">Cosmur Construction Ltd</td>
</tr>
</tbody>
</table>
<p><strong><span style="text-decoration: underline;">Description:</span></strong></p>
<p>This was a project that had to be completed within the very short footballing &#8220;close season&#8221;. It took 6 teams of scaffolders to erect independent towers around the existing West Stand to enable a beamed structure to be linked to produce a high level working platform. This was made more tresting due to the curved nature of the building. The centre section was covered in a Haki System temporary roof as a new banqueting suite was built on the 5th floor.<strong><span style="text-decoration: underline;"><br />
</span></strong></p>
<p><strong><span style="text-decoration: underline;"><img class="aligncenter" src="http://admiral-scaffolding.co.uk/images/cfc.jpg" alt="" width="579" height="337" /><br />
</span></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://admiral-scaffolding.co.uk/chelsea-football-club/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Home Office</title>
		<link>http://admiral-scaffolding.co.uk/home-office/</link>
		<comments>http://admiral-scaffolding.co.uk/home-office/#comments</comments>
		<pubDate>Tue, 21 Jul 2009 06:59:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Haki Temporary Roofing]]></category>
		<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://admiral-scaffolding.co.uk/?p=537</guid>
		<description><![CDATA[Contract Home Office Client Home Office Main Contractor Bouygues UK Description: When the old &#8220;Home Office&#8221; was developed the Admiral Scaffolding Group convinced the client that cost savings could be made by incorporating a &#8220;rolling&#8221; Haki system temporary roof. By constructing the temporary structure on castors and a beam section the expensive roof was able [...]]]></description>
			<content:encoded><![CDATA[<table border="0" cellspacing="0" cellpadding="0" width="629">
<tbody>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Contract</span></strong></td>
<td width="407" valign="bottom">Home Office</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Client</span></strong></td>
<td width="407" valign="bottom">Home Office</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Main Contractor</span></strong></td>
<td width="407" valign="bottom">Bouygues UK</td>
</tr>
</tbody>
</table>
<p><strong><span style="text-decoration: underline;">Description:</span></strong></p>
<p>When the old &#8220;Home Office&#8221; was developed the Admiral Scaffolding Group convinced the client that cost savings could be made by incorporating a &#8220;rolling&#8221; Haki system temporary roof. By constructing the temporary structure on castors and a beam section the expensive roof was able to be rolled into different positions rather than incurring the extra cost of re-erecting it. <strong><span style="text-decoration: underline;"><br />
</span></strong></p>
<p><strong><span style="text-decoration: underline;"><img class="alignleft" src="http://admiral-scaffolding.co.uk/images/rollw.jpg" alt="" width="250" height="188" /><img class="alignright" src="http://admiral-scaffolding.co.uk/images/rollt.jpg" alt="" width="250" height="188" /><br />
</span></strong></p>
<p><strong><span style="text-decoration: underline;"><br />
</span></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://admiral-scaffolding.co.uk/home-office/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Four Seasons Hotel</title>
		<link>http://admiral-scaffolding.co.uk/four-seasons-hotel/</link>
		<comments>http://admiral-scaffolding.co.uk/four-seasons-hotel/#comments</comments>
		<pubDate>Wed, 08 Jul 2009 10:15:03 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Haki Temporary Roofing]]></category>
		<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://admiral-scaffolding.co.uk/?p=187</guid>
		<description><![CDATA[Contract Four Seasons Hotel, Park Lane W1 Client Four Seasons Hotel Main Contractor Beck Interiors Ltd Descriptions: This is an extremely high profile project carried out for Beck Interiors. With this prestigious Park Lane Hotel being totally refurbished under a two year contract it involved a number of complex scaffolds ranging from a Haki system roof [...]]]></description>
			<content:encoded><![CDATA[<table border="0" cellspacing="0" cellpadding="0" width="629">
<tbody>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Contract</span></strong></td>
<td width="407" valign="bottom">Four Seasons Hotel, Park Lane W1</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Client</span></strong></td>
<td width="407" valign="bottom">Four Seasons Hotel</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Main Contractor</span></strong></td>
<td width="407" valign="bottom">Beck Interiors Ltd</td>
</tr>
</tbody>
</table>
<p><strong><span style="text-decoration: underline;">Descriptions:</span></strong></p>
<p>This is an extremely high profile project carried out for Beck Interiors. With this prestigious Park Lane Hotel being totally refurbished under a two year contract it involved a number of complex scaffolds ranging from a Haki system roof spanning fully 27m to cantilevered projections at a height of 30m. <img class="aligncenter size-full wp-image-192" title="4seasons" src="http://admiral-scaffolding.co.uk/images/4seasons.jpg" alt="4seasons" /></p>
<div id="_mcePaste" style="position: absolute; width: 1px; height: 1px; overflow: hidden; top: 0px; left: -10000px;"><span><span style="font-family: Arial; font-size: x-small;">Beck Interiors Ltd</span></span></div>
]]></content:encoded>
			<wfw:commentRss>http://admiral-scaffolding.co.uk/four-seasons-hotel/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Livingstone House</title>
		<link>http://admiral-scaffolding.co.uk/livingstone-house/</link>
		<comments>http://admiral-scaffolding.co.uk/livingstone-house/#comments</comments>
		<pubDate>Tue, 07 Jul 2009 11:01:53 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Haki Temporary Roofing]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Refurbishment]]></category>

		<guid isPermaLink="false">http://www.marceilbeck.com/admiral/?p=49</guid>
		<description><![CDATA[Contract Livingstone House, Wyndham Rd SE5 Client London Borough Of Southwark Main Contractor Albert Soden Ltd Description: This contract involved the complete re-roofing of all sections of Livingstone House whilst at the same time allowing a full external refurbishment of the block. To ensure that the tenants could remain in residence the Client decided to [...]]]></description>
			<content:encoded><![CDATA[<table border="0" cellspacing="0" cellpadding="0" width="629">
<tbody>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Contract</span></strong></td>
<td width="407" valign="bottom">Livingstone House, Wyndham Rd SE5</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Client</span></strong></td>
<td width="407" valign="bottom">London Borough Of Southwark</td>
</tr>
<tr>
<td width="223" valign="bottom"><strong><span style="text-decoration: underline;">Main Contractor</span></strong></td>
<td width="407" valign="bottom">Albert Soden Ltd</td>
</tr>
</tbody>
</table>
<p><strong><span style="text-decoration: underline;">Description:</span></strong></p>
<p>This contract involved the complete re-roofing of all sections of Livingstone House whilst at the same time allowing a full external refurbishment of the block. To ensure that the tenants could remain in residence the Client decided to provide a full scaffold that would incorporate a temporary roof. In discussions with the Main Contractor, Admiral suggested the use of a lightweight Haki temporary roof system. (For more details of this type of scaffold please refer to our specialist page.)</p>
<p>The roof proved challenging because it had to cover four sections of Livingstone House, each of which abutted at right angles a roof of a different height. Admiral designed a scheme which allowed for spine beams to bridge the lower roofs allowing the abutment to be made watertight.</p>
<p><img class="alignleft size-full wp-image-50" title="wyndham" src="http://admiral-scaffolding.co.uk/images/wyndham.jpg" alt="wyndham" width="250" height="188" /><br />
<img class="alignright size-full wp-image-50" title="wyndham2" src="http://admiral-scaffolding.co.uk/images/Wyndham3.jpg" alt="wyndham2" width="250" height="188" /></p>
]]></content:encoded>
			<wfw:commentRss>http://admiral-scaffolding.co.uk/livingstone-house/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

