Chelsea Football Club
July 21, 2009 by admin
Filed under Haki Temporary Roofing
| Contract | Chelsea Football Club |
| Client | Chelsea Football Club |
| Main Contractor | Cosmur Construction Ltd |
Description:
This was a project that had to be completed within the very short footballing “close season”. It took 6 teams of scaffolders to erect independent towers around the existing West Stand to enable a beamed structure to be linked to produce a high level working platform. This was made more tresting due to the curved nature of the building. The centre section was covered in a Haki System temporary roof as a new banqueting suite was built on the 5th floor.

Mansford
July 21, 2009 by admin
Filed under Projects, Refurbishment
| Contract | Mansford |
| Client | Apollo Property Services Group |
| Main Contractor |
Description:
A total of 16 blocks of flats were totally refurbished during a twenty month rolling contract. Often employing as many as 45 operatives strict codes of conduct and timescales were of paramount importance. Admiral Scaffolding Group performed admirably.

Home Office
July 21, 2009 by admin
Filed under Haki Temporary Roofing, Projects
| Contract | Home Office |
| Client | Bouygues UK Ltd |
| Main Contractor |
Description:
When the old “Home Office” was developed the Admiral Scaffolding Group convinced the client that cost savings could be made by incorporating a “rolling” Haki system temporary roof. By constructing the temporary structure on castors and a beam section the expensive roof was able to be rolled into different positions rather than incurring the extra cost of re-erecting it.


Chelsea Hospital
| Contract | Chelsea Hospital |
| Client | Cosmur Construction Ltd |
| Main Contractor | Westminster Health Authority |
Description:
A similar construction as the project at Chelsea FC was the reason that lead cosmur to re-engage the Group’s services. Again another floor was to be erected to an existing wing of the hospital and the Group deployed exactly the same method of towers and beamed bridging to give the client what they wanted.

Four Seasons Hotel
July 8, 2009 by admin
Filed under Haki Temporary Roofing, Projects
| Contract | Four Seasons Hotel, Park Lane W1 |
| Client | Four Seasons Hotel |
| Main Contractor | Beck Interiors Ltd |
Descriptions:
This project involved the taxing task of designing a temporary roof with a maximum span of over 20m at an exposed height of 30+m. This was designed to suit the Haki temporary roofing system. It was completed in January 2009, just in time to receive and withstand the massive loadings imposed by the freakish snowfall of February – the worst in 100 years!

University of Westminster
July 8, 2009 by admin
Filed under Projects, Refurbishment
| Contract | University of Westminster |
| Client | Cosmur Construction (London) Ltd |
| Main Contractor | University of Westminster |
Description:
This project entailed hoisting around 40 tonnes of scaffolding plant over a busy Regent St up onto the university roof. This meant that combined with a very stringent programme the health and safety requirements were extremely high. Good liaison with the client enabled a strike and shift programme to be drawn up which allowed for the works to be completed within the allotted timescale. This plant then had to be lowered down the rear of the building to allow a scaffold that had been specifically designed to keep loadings off of the low level roofs to be built. There were some very historic roof lights that had to be protected at all costs – thankfully our considerate operatives performed admirably allowing a potentially troublesome project being completed successfully and on time for all parties.
Jewish Care Home
| Contract | Jewish Care Home |
| Client | Jewish Care Home |
| Main Contractor | Bowmer & Kirkland Ltd |
Description:
Erecting a standard scaffold with progress of works for a concrete frame and then adapting it to suit all of the following trades was the task that confronted the Group. In discussion with the client all needs were addressed and a correct specification for the project developed. This process enabled the project to be costed effectively to the mutual benefit of both the client and the Group.
Vale Rd
| Contract | Vale Rd, Windsor |
| Client | Healthcare Development Services Ltd |
| Main Contractor |
Description:
Providing accommodation for the elderly is the specialisation of our client with the projects all typical of this brick built four storey block.
Battersea Park Rd
| Contract | Battersea Park Rd |
| Client | MP Brothers Ltd |
| Main Contractor |
Description:
This project comprised the re-furbishment of existing warehouses and the construction of a typical concrete framed building. The ground floor contains retail units and a day nursery whilst on the upper four floors sumptuous views across London are accessed from luxurious apartments.
Heart Centre Walton
| Contract | Heart Centre Walton |
| Client | RI Building Services Ltd |
| Main Contractor |
Description:
This project entailed the complete construction of the state of the art combination of retail and residence. Shopping does not get much better than this modern mall and on the higher levels offices combine with luxurious apartments ranging from one bed to penthouse; a complete urban marriage.